Hazardous Liquid Course Offerings
TOPIC FOCUS AREAS:
CONSTRUCTION
COURSE TITLE | COURSE DETAILS | COURSE # |
Weld-on Steel Pipelines |
|
LD-1 |
Inspect Welding Processes and Welds on Steel Pipelines |
|
LD-2 |
Perform Non-Destructive Tests on Steel Welds |
|
LD-3 |
Make Field Repairs on Liquid Pipelines |
|
LD-4 |
(Top of page)
PRESSURE TESTING
COURSE TITLE | COURSE DETAILS | COURSE # |
Pressure Testing Hazardous Liquid Pipelines |
|
LE-1 |
(Top of page)
OPERATION AND MAINTENANCE
COURSE TITLE | COURSE DETAILS | COURSE # |
Identify Basic Procedures to Maintain Proper Operation of Breakout Tank Installations |
|
LF-1 |
Locate and Mark Underground Pipeline Facilities |
|
LF-2 |
Verify Excavating and Backfilling Operations that Minimize Excavation Damage to Pipeline Facilities |
|
LF-3 |
Monitor and Regulate the Flow and Pressure of Hazardous Liquids from Remote Locations |
|
LF-4 |
Purge Liquid Pipelines |
|
LF-5 |
Inspect, Service, and Operate Manual Line Valves |
|
LF-6 |
Abandon and Deactivate Hazardous Liquid Pipeline Facilities |
|
LF-7 |
Patrol Pipeline Right-of-Way Easement |
|
LF-8 |
Launch and Receive Pipeline Pigs |
|
LF-9 |
Inspect and Test Pressure Regulating and/or Pressure Relief Devices for Proper Operation and Mechanical Condition |
|
LF-10 |
Identify Methods of Investigating and Detecting Hazardous Liquids Pipeline Leaks |
|
LF-11 |
Identifying Procedures for Moving In-Service Pipelines |
|
LF-12 |
(Top of page)
CORROSION CONTROL
COURSE TITLE | COURSE DETAILS | COURSE # |
Perform Pipe-to-Soil Potential Measurements on Buried Pipelines |
|
LH-1 |
Determine Areas of Active Corrosion Using Close Interval Survey Methods |
|
LH-2 |
Inspect and Maintain Cathodic Protection Rectifiers for Proper Operation |
|
LH-3 |
Install and Test Insulation to Control External Corrosion by Electrical Isolation |
|
LH-4 |
Inspect the External Condition of Exposed Buried Metal Piping to Determine if Repair or Replacement is Necessary |
|
LH-5 |
Install Test Leads to Monitor and Control External Corrosion |
|
LH-6 |
Inspect for Evidence of Internal Corrosion |
|
LH-7 |
Inspect and Monitor Exposed Piping for Evidence of Atmospheric Corrosion |
|
LH-8 |
Measure the Extent of Corrosion on Pipeline Facilities |
|
LH-9 |
Inspect the Effects of Interference Current |
|
LH-10 |
Apply and Repair Pipeline Coatings |
|
LH-11 |
(Top of page)
operation and